05-27-2020.CLUBHOUSE RENOVATION SUBCOMMITTEE BACKUP

Page 5 11 01 19

vi. Stretched fabric ceilings

f. Add 2 new retractable walls g. Build out interior walls at windows (conceal ac grilles)

K- Add new walkway where existing roof is connecting from the valet to the existing walkway on the west side of the building up against the lounge and main dining room. Adjust the storage room to make clearance for the new walkway connection. a. New railings will all be glass with an aluminum top rail.

b. New flooring with waterproofing c. Space is not covered enclosed d. Tie into existing stair e. Provide exterior wall sconce lighting along the walkway L- Remove walls and add additional SF to make a new pre-function a. New and existing construction tied together b. New roof over new addition c. New exterior entry door d. Renovate the finishes i. New flooring ii. New base iii. Repair drywall and paint wallcovering iv. New modern crown molding v. Decorative fixtures and typ. Lighting

M- Add in new covered walk (optional)

a. Steel Columns with precast wraps b. Exterior wood ceiling finish- stained c. Match existing hardscape pavers d. Decorative down lighting

N- New Banquet Kitchen/Remove walls

a. Demo existing men’s and women’s restroom b. Take back the hallway to the lounge c. Incorporate all new space into banquet kitchen d. Provide new flooring, epoxy flooring, acoustic tile e. Lighting f. All new equipment g. All new MEP