Page 4 11 01 19

v. Decorative fixtures and typ. Lighting

H- Add new Storage

a. Drywall & Paint b. Utility lighting c. VCT Flooring

I-

Renovate to become new Lounge a. Move walls

b. Add a new bar renovate the existing lounge bar with new finishes, bar top and bar face and a new back bar. This effects lighting of bottles with effect MEP. Relocate existing bar to west wall with all new equipment and connections. c. as an option – make it longer and put the service door in back of the bar. Service station to be reworked in same location. d. Add MEP for the bar e. New door to the dining area remove the French doors and replace them a retractable Nana wall to join the Lounge to the main dining room west side. f. Remove the floating beams in the lounge (if possible – if they are not structural, as they don’t appear to be) g. Renovate the finishes i. New flooring ii. New base iii. Repair drywall and paint wallcovering iv. New modern crown molding v. Decorative fixtures and typ. Lighting vi. Add a new large decorative pendant in the center of the ceiling. h. Build out interior walls at windows (conceal ac grilles) i. New pairs of doors along South and North walls in room j. Custom millwork on west side of room back side of bar

J- Banquet Rooms Renovate the exiting dining room in the same location. a. Remove walls/add new small addition with new roof/envelope b. Add new additional space that is needed c. Exterior glass & doors d. Position over existing wall below e. Renovate the finishes i. New flooring ii. New base iii. Repair drywall and paint wallcovering iv. New modern crown molding v. Decorative fixtures and typ. Lighting

Made with FlippingBook flipbook maker