05-27-2020.CLUBHOUSE RENOVATION SUBCOMMITTEE BACKUP

Page 6 11 01 19

O- New restrooms/vestibule remove walls/reconfigure a. Demo part of existing main kitchen

b. Use space for new men & women room c. Re-plumb all new fixtures & finishes d. All new toilets

P- Remodel BOH/Elevator 2 service elevators a. Plastic laminate walls

b. Metal Ceiling c. Epoxy Floor d. See elevator summary for repairs needed

Q- Reconfigure main kitchen TBD with CBI and Club for new layout. Kitchen consultant TBD a. All new flooring- waterproof existing New epoxy flooring

b. Fix all existing leaks c. Renovate the finishes i. New flooring ii. New base

iii. Repair drywall and paint wallcovering iv. New modern crown molding v. Lighting

d. Remove all equipment & reuse e. New Ceiling and LED lighting

R- Add in new Kitchen space/move/add walls

S- Storage

a. VCT Flooring b. Drywall Painted c. Typical Lighting

T- Grill Room

a. replace fabric ceilings where necessary for duct rework b. Add icynene

U- Sports Bar

a. New waterproofing b. Replace existing floor tile

FIRST FLOOR

A- Back of House Offices

a. Reconfigure new walls, new offices

Made with FlippingBook flipbook maker