05-27-2020.CLUBHOUSE RENOVATION SUBCOMMITTEE BACKUP
Shore area shaded in red until all work is complete.
remove beam and replace with wide flange beam
remove beam and replace with wide flange beam
remove column
remove column
remove beam
remove beam
The deck is framed with composite joists. There are studs welded to the joists and cast into the concrete deck. Removal of the 4 beams will require meticulous demolition in order to keep the 2nd floor operational
Made with FlippingBook flipbook maker