05-27-2020.CLUBHOUSE RENOVATION SUBCOMMITTEE BACKUP
Page 3 11 01 19
iii. Repair drywall and paint wallcovering iv. New modern crown molding v. Decorative fixtures and typ. Lighting vi. Custom gyp. Bd. With recessed handrail integrated in wall as railing/guardrail. b. New Railings i. Integrated into low gyp. Bd. wall
D- Renovate halls & restrooms a. Renovate the finishes
i. New flooring – stone wood ii. New base iii. Repair drywall and paint wallcovering iv. New modern crown molding v. Decorative fixtures and typ. Lighting vi. New sink & toilet fixtures vii. Add ADA restroom stall in each restroom viii. Replace toilet partitions with full height walls and louvered doors ix. New cabinetry at vanity
E- Renovate HALL vestibule with new walls- enclose wall openings & repair walls as noted a. Renovate the finishes i. New flooring ii. New base iii. Repair drywall and paint wallcovering iv. New modern crown molding v. Decorative fixtures and typ. Lighting vi. There will be a new built in seat in the center of the space.
F- Add new halls and vestibules a. Renovate the finishes i. New flooring ii. New base
iii. Repair drywall and paint wallcovering iv. New modern crown molding v. Decorative fixtures and typ. Lighting
G- Add new Multipurpose Room a. Renovate the finishes
i. New flooring - carpet ii. New base iii. Repair drywall and paint wallcovering iv. New modern crown molding
Made with FlippingBook flipbook maker