05-27-2020.CLUBHOUSE RENOVATION SUBCOMMITTEE BACKUP

Page 2 11 01 19

SECOND FLOOR

A- Renovate existing lobby- 1 room lobby a. Remove the existing wall doors and windows between the vestibule and the lobby creating one space b. Renovate the finishes i. New flooring – stone and wood ii. New base iii. Repair drywall and paint wallcovering iv. New modern crown molding v. Add new height to ceiling in the center of the vestibule space. vi. Remove clouds and add in new ceiling and trim, crown. vii. Redo A/C venting to conceal it. viii. Decorative fixtures and typ. Lighting ix. Remove the door on the east side and build a new back wall. New wine room in existing stair location with glass conditioned walls – private dining room. x. Add a new reception desk at this area and adjust lighting accordingly. The desk will have a quartz top and be a high end wood finish – TBD. The desk will need electrical power and data. Custom piece furniture. xi. Remove the existing sliding front doors. Replace them with new 10’ tall front doors – wood with glass. Hardware will be large metal pulls. They doors operate on an eye to auto-open. 3’- 6” wide each leaf, custom NOA wind load testing. Single panel 2-3/4” thick rift white oak veneer, bleaching oil finish. xii. There will be a large decorative light fixture in the center of the space. xiii. Build out interior walls at windows (conceal ac grilles) a. Fix sagging beams by removing cupola on roof and fix structure b. New modern gas fireplace 72” c. New exterior doors on North wall d. All new finishes in room e. Built-in case work on West wall f. 3” thick rift white oak veneer, bleaching oil finish, frits Juergens center pivot hinges with integral “hold open” function g. Build out interior walls at windows (conceal ac grilles) h. New doors on south side or room B- Living Room

C- Renovate stair Move stair to new location a. Renovate the finishes i. New flooring- carpet ii. New base

Made with FlippingBook flipbook maker