05-27-2020.CLUBHOUSE RENOVATION SUBCOMMITTEE BACKUP

Page 10 11 01 19

Q- Remodel all halls/stairs/elevator/member areas a. Renovate the finishes i. New flooring ii. New base iii. Repair drywall and paint wallcovering iv. New modern crown molding v. Decorative fixtures and typ. Lighting

R- Remodel Golf Pro Shop

a. New Front Desk with display case b. Rework walls inside the space c. Provide new built in display fixtures d. Renovate the finishes i. New flooring ii. New base

iii. Repair drywall and paint wallcovering iv. New modern crown molding v. Decorative fixtures and typ. Lighting

S- Renovate Site/Landscaping/ ½ house

a. Renovate existing halfway house renovate the existing halfway house b. Provide new Kitchen equipment c. Provide new trees and landscape lighting- TBD with landscape plan

T- New parking configuration. a. See new site plan by Insite studios for all the details.

END

P:\17\FRENCHMAN'S CREEK-17234\BUDGET\2019-10-31 DD TO PROCTOR FOR PRICING\FRENCHMANS- DESIGN SUMMARY MASTER.DOCX

Made with FlippingBook flipbook maker