Page 9 11 01 19

iv. New modern crown molding v. Decorative fixtures and typ. Lighting

b. New full height custom doors on pivots and wood/glass panels per renderings c. Eliminate column in room with mechanical room relocated and rework exterior wall

J- Remodel Meeting Room New Media Room (where stair is eliminated) a. Renovate the finishes i. New flooring - carpet ii. New base iii. Repair drywall and paint wallcovering iv. New modern crown molding v. Decorative fixtures and typ. Lighting b. New ceiling with acoustical room for theatre

c. Remove column and reinforce beam where wall removed at stair for room.

K- Remodel/Reconfigure 19th hole

a. Eliminate columns per sketch b. Rework grille area to built-in serving areas c. Rework prep area/kitchen to accommodate relocated dishwasher area d. Relocate serving station e. Rework mechanical and prep area on west side where bar is removed f. Relocate bar to center of room on south side of room i. Add new lockers

ii. Faces should be solid wood- digital locks iii. New wet areas- new porcelain tile floors

iv. New walls v. New MEP vi. New Bar

L- Modify/upgrade downstairs kitchens

a. Existing Flooring alternate for new epoxy flooring b. Replace all Equipment with new

M- Modify upgrade main Kitchen/BOH- Club to provide information

N- Move Woodshop/Give space to kitchen/BOH- Price new bldg. separately – Layout TBD- These spaces absorbed into new kitchen

O- Move Laundry – These spaces absorbed into new kitchen

P-

Laundry and Woodshop

a. New layout of rooms b. Provide proper ventilation and AC for these 2 areas c. Laundry to be increased to accommodate laundry from beach clubhouse d. Laundry - Ventilate though south wall, proposed venting through the wood shop e. New ventilation/exhaust for wood shop