revisedFORreno__FINAL BUILDING PROJECT FILE _ JAN 28 AT 5 PM
SUBSTANTIAL RENOVATION
• An outside walkway around the west side provides easy access avoiding the need to pass through the ballroom to the Sports Bar and new outdoor terrace. • TheLadiesCardRoom willbenearlytwice the size with the addition of an adjoining room, created with pivot glass doors. • The Grille outdoor covered terrace will offer expanded seating for al fresco dining, and an extraordinary way to enjoy tennis exhibitions, private events andmore. • The new west side entrance and lobby on the 1st floor provides a more welcoming experience.
• A new fortified roof will have upgraded wind resistance meeting necessary codes. • Thorough investigation and action will be taken in every space. There are additional contingency dollars in this budget to replace air handlers and ducts in the POA and the Back of the House if needed. • A new HVAC and mechanical system will meet the latest code to ensure Members’ health and safety. • The renovation features new grading around the facility and upgraded storm drainage systems.
Reception - Lobby and Prefunction
5
Made with FlippingBook - professional solution for displaying marketing and sales documents online