Town of Juno Code Enforcement. Beach services will be available including complimentary non-alcoholic beverages and sandwiches.

Main Club Summer Projects: Summer projects and general annual maintenance are currently being performed at the main clubhouse and the Beach Club. Several projects being done this summer include but are not limited to:  Replaced 19 th Hole cooler & Reach-in door gaskets.  Removed wallpaper and paint walls in the men’s and ladies locker room at the fitness.  Removed wallpaper and paint walls in the fitness nail room.  Refresh North golf course and driving range bathrooms and ice/water machine (includes annual general maintenance).  Refinish Grille room furniture and upgrade sound system.  Replaced tennis court #11 fences.

 Refinish furniture in Lounge and living room.  Installed new lift station pump at the fitness.  Installed new steamer in main kitchen.  In the process of installing the street sign machine.  Resurface fitness pools in August.  Install new ceiling in main kitchen in August.  Installed Sports Bar TV cover  Install safety stair treads on the eastside to Sport Bar.  Installed new dishwasher in the 19 th Hole kitchen.  Air Quality test was completed in June.

Beach Club Summer Projects:  Repaired the walk way to the beach.  Replaced shower heads.  P.M kitchen equipment.  Extensive painting inside and out.

 Termite Treatment of the facility in July.  Relocate laundry facility to the main club.  Removed bamboo ceiling trim and installed wood trim due to termite damage.  Install new automatic sliding door. V. HUMAN RESOURCES: All J1 trainees are participating in our summer department rotation program which helps them to develop their skills and complete their internship requirements. The process of preparing for J1 and H2b visa approvals is underway. Staff participation in our Leadership, English and Business classes have been very successful. All departments are being educated on our Hurricane Preparedness Manual and Hotline contact information. VI. FINANCIAL OVERVIEW: The community has a positive variance compared to budget of $39k; the club income being favorable to budget by $5k with the POA favorable to budget by $34k. While overall results for the first two months are

Executive Director’s Report – July 25, 2019

Page 2